AI Operations · B10–B27wk 2 / 54
B18 · measurement · Orchestration & durability

The Deterministic Finding

Status
planned
Weeks
2527
Permission gate
none
Depends on
B10 · B11 · B12
Page depth
outline
This is an outline, not a result.
Nothing here has been built. It states what the block is for, what it has to produce and what would make it a failure, so that the claim can be checked against the result later. Written 2026-09-01, and it will change.

Why this block exists

Scheduled here because it comes the shadow needed elapsed time. Two blocks of passive accumulation is the point, not a delay.

What it has to produce

Analyze weeks of accumulated shadow data and publish where rules beat the agent. Produce the single most differentiating artifact in the plan.

01What it has to teach me

topiccomparative analysis
topicstatistical significance for small samples
topichonest reporting of unfavorable results

02Evidence this page will carry

emptyPrimary artifact
emptyMeasured result
emptyRejection record
2026-09-01Outline created from the AI Operations Roadmap (B10-B27).
B17 Orchestration ComparisonB19 Durability I (Idempotency and Resume)