AI Operations · B10–B27wk 2 / 54
B11 · operations · Live operation

Surface Zero Goes Live

Status
planned
Weeks
46
Permission gate
rung A
Depends on
B10
Page depth
outline
This is an outline, not a result.
Nothing here has been built. It states what the block is for, what it has to produce and what would make it a failure, so that the claim can be checked against the result later. Written 2026-09-01, and it will change.

Why this block exists

Scheduled here because it comes every posting in this category screens on operating experience over time. A thin system with a year of history beats a sophisticated one with three weeks, and there is no later date at which you can catch up.

What it has to produce

Get something real into production with an external dependent, as early as physically possible. Start the only clock in this plan that cannot be compressed, parallelized, or bought back later.

01What it has to teach me

topicproduction deployment discipline
topicrun-ledger design
topicmaintainer stakeholder management
topicadvisory-agent design

02Evidence this page will carry

emptyPrimary artifact
emptyMeasured result
emptyRejection record
2026-09-01Outline created from the AI Operations Roadmap (B10-B27).
B10 Evaluation Harness. The FoundationB12 The Installable